Hoyle Tanner completed the preliminary engineering study to upgrade the South Woodstock WWTF. The original WWTF was a 50,000 gpd package conventional activated sludge facility that had not been upgraded since 1966. Redundancy was not provided for process tankage including the aeration basin and secondary clarifier. Therefore, the process units could not be taken offline for tank inspection or repair. The facility is now required to nitrify and denitrify with an effluent Total Nitrogen (TN) limit in the NPDES permit. Additionally, a portion of the WWTF site is in the Regulatory Floodway, creating significant limitations on siting new process tankage.
For the upgrade of the WWTF, three process alternatives were considered: Sequencing Batch Reactor (SBR), Membrane Bioreactor (MBR), and submerged attached growth bioreactor (SAGB). The alternatives were evaluated based on a life-cycle cost analysis and non-monetary factors. The recommended alternative was an SBR process with an innovative equipment layout, allowing all process equipment to be accessed from above the water line. This allowed for a two-tank SBR process without pre-equalization to meet the Vermont DEC SBR design guidelines. This innovative approach saved capital cost while realizing a lower life-cycle cost, as well. The new facility was constructed and put into service prior to decommissioning the original facility. Construction of the new SBR facility was completed in 2023.
SERVICES
Study
Alternatives Development & Analysis
Preliminary Design
Permitting
Funding Assistance
Public Outreach
Final Design
Bid Process Administration
Construction Administration
From the blog
Learn about ongoing projects and the innovative processes we employ for our clients.
We are pleased to welcome Joshua Sklarsky as Hoyle Tanner's first Chief Technology Officer (CTO). With more than 15 years of experience, Joshua is a strategic technology leader with...
Drought is often understood as a period with too little rain, but its impacts extend far beyond dry landscapes. Drought status influences drinking water supplies, groundwater availability, infrastructure performance,...
Hoyle Tanner is proud to announce that the Maplewood Avenue Bridge Rehabilitation Project in Portsmouth, New Hampshire has earned a Silver Award in the Engineering Excellence Awards presented by...
At Hoyle Tanner, our strength starts with our people. Each year, our leadership team takes the opportunity to recognize individuals who are not only delivering great work for our...
Mountain condo community across the river from Loon Ski Resort upgrades drainage, roadways and landscaping. Hoyle Tanner is providing civil engineering design, permitting and construction administration services for a...
Across New England, interest in trail and active transportation projects continues to grow. Communities see the benefits clearly – improved connectivity, safer travel options, and more vibrant public spaces....
Meet Christyn Bergquist, Project Assistant & Curator of Good Vibes What drew you to Hoyle Tanner? What first drew me to Hoyle Tanner was its presence in the community...
A RISER Mindset This Earth Day, we’re taking a moment to reflect on the Resilient, Innovative, Sustainable, Economical, and Renewable (RISER) solutions we’ve engineered alongside our clients. At Hoyle...
When a project involves land acquisitions or easements, Right-of-Way should be engaged early and treated as a critical component of project planning - not an afterthought. Right-of-Way involvement should...