The Longley Covered Bridge was built in 1863 by the Jewett Brothers. The bridge is a 70′ long single span Town Lattice Truss, which spans the Trout River near the northwestern boundary of the Town of Montgomery with the Town of Enosburgh. The bridge is the oldest of six covered bridges remaining in the Town of Montgomery. Several serious structural deficiencies were observed during a routine bridge inspection by VTrans personnel, and as a result, the bridge was closed to traffic. Vehicular traffic was bypassed to a temporary prefabricated steel truss bridge located immediately downstream of the existing covered bridge.
The project consisted of preserving the original design of Town Lattice Truss and retaining the roof framing and upper lateral bracing. The new trusses and floor framing were designed for a 20 ton live load. The project also included application of a fire retardant coating, installation of a timber curb to protect the trusses, installation of new steel backed timber guardrail and approach roadway improvements. This project was partially funded through the National Historic Covered Bridge Preservation Program.
SERVICES
Condition Assessment
Final Design
Permitting
From the blog
Learn about ongoing projects and the innovative processes we employ for our clients.
Demand for aircraft hangars is outpacing availability at many airports. According to the Aircraft Owners and Pilots Association (AOPA), 71 percent of airports across the country have reported a...
Stormwater is one thing people rarely think about until there is a problem. A flooded roadway, a washed-out culvert, standing water in a neighborhood, erosion along a streambank, or...
The Worcester-Elmore Route 12 Bundled Bridges Project has received the 2026 Northeastern Transportation and Wildlife Conference (NETWC) Innovation – Transformation Award. The recognition reflects an approach that treated bridge...
Meet Riley Pantalena – Airport Engineer & Irish Dancer What drew you to Hoyle Tanner? My decision to attend UVM in Burlington was definitely my starting point for ending up...
Join us in celebrating the employees marking work anniversaries this month. Together, they represent 78 years at Hoyle Tanner, bringing their experience, knowledge, and unique contributions to the firm every day.
As Bradley International Airport advances its long-term airfield improvement program, the Taxiway T extension is helping position the airport for safer and more efficient operations while supporting future growth....
We are excited to welcome back Nicole Crawford, PE to Hoyle Tanner as an Aviation Project Manager! Nicole brings more than 15 years of aviation and transportation engineering experience,...
Meet David Vitali, PE - Airport Engineer & Groove Alchemist What drew you to Hoyle Tanner? Ultimately, it came down to the people and how much the company values...
Protecting Water Quality for Two Communities & the Merrimack River Watershed Construction is underway on major improvements to the Allenstown Wastewater Treatment Facility, marking an important milestone in a...