Drone Demonstration for Aircraft Accident Investigation
Massachusetts
Project Summary
The MassDOT Aeronautics Division reached out to select members of the drone community soliciting participation in a Drone Demonstration research project to display drone capabilities to support MassDOT and MBTA missions. Hoyle Tanner was chosen to demonstrate capabilities for accident investigation and airport inspection services. Objectives for this demonstration were to conduct a cost-benefit analysis and compare drone methods vs. traditional non-drone methods for accident investigation and airport inspection services. Being one of a few drone experts and participating in one of six different drone demonstrations, Hoyle Tanner was able to assist MassDOT in analyzing drone applications and identifying what works well and what presents challenges. The results of this research project are being used by MassDOT as they move forward with their in-house Drone Program.
SERVICES
Condition Assessment
Report Preparation
sUAS Data Collection
From the blog
Learn about ongoing projects and the innovative processes we employ for our clients.
We are excited to announce that Structural Engineer Katie Welch has been appointed Director at Large for the Structural Engineers of New Hampshire (SENH) Board of Directors. The SENH...
At Hoyle Tanner, we have been deeply involved in the planning and design phases of the Millinocket Municipal Airport project. This project is a significant part of the town's...
Project Overview Hoyle Tanner is providing environmental engineering design and construction services for the Brighton Wastewater Treatment Facility (WWTF) upgrade. The Brighton WWTF operates a small lagoon system with...
Our team has been hard at work load rating bridges across Massachusetts. In simple terms, a load rating is an evaluation of a bridge to determine its capacity to...
What drew you to Hoyle Tanner? When I first started looking for an internship, I honestly had no idea what I was looking for. I applied to the Construction...
One of the most important, challenging, and rewarding aspects of the civil engineering curriculum at a college or university is the senior capstone project, or senior project. A “culminating...
What drew you to Hoyle Tanner? As a student who hasn’t decided on a career path, I value the different divisions that Hoyle Tanner has to offer. I figured...
Meet Eric Doe, PE – Wastewater Engineer & DIYer What drew you to Hoyle Tanner? It was a combination of factors that ultimately had me accept a job offer...
Airports have access to a wide range of funding options—but navigating these opportunities can be complex. Hoyle Tanner helps airports strategically plan, prioritize, and secure the funding they need...