Due to aging infrastructure and increased demand, the University System of New Hampshire needed to upgrade the existing 10-inch ductile iron water main in both College Road and Library Way. Hoyle Tanner provided design services through construction documents and technical specifications for 1,100 feet of new 12-inch water main and pavement resurfacing. The project included site improvements such as a new ADA compliant bus pullout, bicycle lanes, sidewalks, and drainage modifications, promoting safer pedestrian and bicycle traffic.
The project also included design of new sidewalks on Great Lawn and in front of Nesmith Hall which experience high pedestrian volumes when classes are in session at the University. Portions of the sidewalk on College Road also function as the top of the existing steam tunnel. One-way traffic was maintained on College Road for the duration of the project. Construction was completed on-schedule and on budget.
SERVICES
Bicycle Lanes
Bus Pull-out
Roadway Design
Sidewalk Design
Water System Design
Bid Phase Administration
Construction Administration
From the blog
Learn about ongoing projects and the innovative processes we employ for our clients.
Hoyle Tanner Project Engineer Greg Dusseault has been appointed Professional Organization Liaison for the BSCES Younger Member Group, where he will help build connections with professional organizations and young professionals.
We are proud to share that Matthew Cardillo, an Assistant Project Manager and Airport Planner in Hoyle Tanner’s Aviation Division, has earned his American Association of Airport Executives Certified...
I was first introduced to surveying in high school through an introductory engineering class, but at the time, I didn't realize it was something I could pursue as a...
Hoyle Tanner is thrilled to announce that the Cousins River Bridge replacement project has received the Grand Conceptor Engineering Excellence Award presented by ACEC of Maine! The Grand Conceptor...
Federal funding helps many New Hampshire communities pay for bridge replacements, road improvements, sidewalks, trails and safety upgrades. The opportunity is significant, but so are the rules that come...
One of the project's biggest challenges had nothing to do with the bridge itself. US Route 1 is an important connection between Yarmouth and Freeport. Closing it during construction...
Each quarter, employees nominate colleagues who go above and beyond to support their teams, projects, and coworkers. Meet our Q3 Movers and Shakers and see what their peers had to say about their contributions.
For decades, airports have largely planned their fueling facilities around two familiar products: 100-octane low-lead aviation gasoline (100LL) for piston-engine aircraft and Jet A for turbine-powered aircraft. That landscape...
Christian Boisvert, PE, Hydraulic Engineer & Amateur Rugby Player What drew you to Hoyle Tanner? I really liked the size of the firm and the local office in Burlington,...