Riverwalk Park, Parking Lot & Pedestrian Bridge Grove Street
Riverwalk Park, Parking Lot & Pedestrian Bridge Grove Street
Hoyle Tanner was retained by the Town of Peterborough to find an innovative solution to the need for additional parking in the downtown area for shops and businesses. With limited space downtown, Hoyle Tanner looked at options to the south of Town along the Nubanusit Brook and Contoocook River. Hoyle Tanner designed a new 60-space parking lot in an undeveloped parcel of land located in close proximity to Peterborough’s downtown area. All vehicles access the new parking facility via a new driveway connecting to Grove Street. The parking lot features two drive aisles with double stack parking on each side. The north end of the parking lot features a drop-off/turnaround to allow for continuous vehicle circulation, enhanced maneuverability, and a staging area to be used for farmer’s markets. Stormwater is treated with rain gardens and a large underground infiltration chamber system.
An 8′ wide pedestrian bridge was constructed across the Nubanusit Brook to provide connectivity and continuity from the new parking lot to the downtown area. Concrete sidewalks were also constructed from Grove Street along the access drive and parallel to the parking lot to connect the parking with the pedestrian bridge. A new landscaped seating area was constructed between the parking facility, the Contoocook River and the pedestrian bridge to create a park-like feel to provide an area for recreation and for users to enjoy the views of the surrounding waterways.
- Conceptual Design
- Final Design
- Bid Process Administration
- Stormwater Management
- Construction Administration
From the blog
Learn about ongoing projects and the innovative processes we employ for our clients.
Defining Village Boundaries: The Role of Gateway Treatments in Traffic Calming
November 21, 2024
Sometimes, when driving along a rural road, the only indication that you’re entering a town might be a small speed limit sign that is easily missed. The lane widths...
Read More
Employee Spotlight: Karen Allen
November 15, 2024
Meet Karen Allen, Senior Project Assistant & Inquisitive Learner What drew you to Hoyle Tanner? I was drawn to Hoyle Tanner after researching the company and experiencing its commitment...
Read More
At the Airport: Good Fences DO Make Good Neighbors!
November 14, 2024
If you have ever had a close encounter with wildlife while driving your car – glimpsed a deer, coyote or even a large turkey or raccoon at the side...
Read More
2025 FAA AIP Grants: What do I Need to do & When do I do it?
November 12, 2024
The Federal Aviation Administration’s (FAA) Airport Improvement Program (AIP) runs on a Federal Fiscal Year of October 1st to September 30th. Though still working on grants from prior years, on...
Read More
New Boston Secures Federal Grant for New Fire Station: A NEPA Success Story
November 6, 2024
Almost one year ago this month, I was contacted by Assistant Chief Brian Dubreuil, the New Boston Fire Department Administrator and Deputy Emergency Management Director, who asked if we...
Read More
How We’re Connecting South Burlington’s Existing Bike & Pedestrian Facilities
November 4, 2024
Hoyle Tanner is at work on transportation projects in South Burlington, Vermont to better connect bike/ped pathways! While the projects are in different stages, they are both part of...
Read More
November Employee Anniversaries
October 31, 2024
We are pleased to announce the following employees are celebrating employment anniversaries this month; combined, they have 15 years at Hoyle Tanner. The effort and dedication of our employees...
Read More
Behind the Scenes: Completing Qualitative Scour Reports for Bridge Safety
October 28, 2024
We’re Doing QSRs – what are they? Qualitative scour reports (QSRs) document the scour history and vulnerability of a bridge. We are currently working on multiple QSRs for MaineDOT....
Read More
From Plans to Pavement: Designing & Running the Revel Race Series on the Kancamagus Highway
October 15, 2024
On May 5th, 2024, I had the opportunity to see the result of a project that I was a part of when I was still interning at Hoyle Tanner,...
Read More